When a 90-meter Large-Span Steel Pipe Truss begins to sway during hoisting, it’s rarely the steel that’s at fault—it’s the installation decisions made days earlier.

Large-span steel pipe trusses are widely used as roof structures for airport terminals, stadiums, convention centers, and industrial facilities. They provide large column-free spaces while offering high rigidity and efficient material use. These structures typically consist of circular or square steel tubes connected by welding or bolted spherical nodes.
However, installation heights can exceed 20 meters, while the open-grid structure creates multiple working edges and frequent cross-construction activities. High-altitude installation is therefore one of the most safety-sensitive stages of a large-span steel pipe truss project.
Key Risks in Large-Span Steel Pipe Truss Installation

The main installation risks can be grouped into five categories:
| Risk | Typical Causes | Potential Consequences |
| Fall from height | Open edges, inadequate protection, improper harness use | Worker injury or fatality |
| Component instability | Incorrect lifting points, uneven lifting, excessive speed | Deformation, buckling or overturning |
| Hoisting equipment | Wrong crane selection, overloading, unstable ground | Crane or sling failure |
| Welding operations | Sparks, temporary wiring, poor grounding | Fire or electric shock |
| Adverse weather | Strong wind, rain or snow | Loss of lifting control, delays and increased risk |
Among these risks, structural stability during hoisting and fall protection require particular attention. The stress conditions of truss members change during lifting, and incorrect sling-point selection or lifting speed may cause deformation or instability.
At the same time, workers performing alignment, bolting, or welding at height face significant fall hazards if suitable safety nets, guardrails, lifelines, and other protection measures are not provided.
How to Reduce Risk Before a Large-Span Steel Pipe Truss Installation Begins
Preparation and review of special construction schemes
For each project, a special scheme including safety technical measures must be prepared, clearly defining hoisting unit division, sling point locations, temporary support arrangement, and protective facilities. By rationally dividing hoisting units, a large amount of high‑altitude welding work can be transferred to the ground, effectively reducing core risks. For new technologies or higher‑risk cases, expert review should be organized.
Selection and inspection of hoisting equipment
Based on the maximum weight of the truss units, installation height, and working radius, scientifically select the crane and verify its rated performance. All hoisting machinery must have valid inspection reports, and safety devices must be sensitive and reliable.
Design of temporary support systems
Before the truss forms a stable structure, temporary support towers must be erected. Their stiffness, strength, and stability must be strictly calculated, and foundations must be solid to prevent settlement.
Training and technical briefing for workers
All special‑trade workers must hold valid certificates. The project department shall organize safety education and graded technical briefing to ensure full understanding of risks and operating procedures when working at height.

Development and drills of emergency plans
Prepare disposal plans for various emergencies and conduct drills to verify the effectiveness of emergency supplies, response procedures, and external liaison.
Critical Safety Controls During Large-Span Steel Pipe Truss Hoisting and Welding
During installation, dynamic and precise control over key processes is required.
Hoisting operation
Arrange sling points according to the approved lifting scheme. For long-span units, multi-point lifting or spreader beams may be used. Lift smoothly, use tag lines for positioning, and assign a signalman to coordinate the operation.
Fall protection
Provide safety nets, guardrails, lifelines, and suitable fall-protection systems for high-altitude work. Stable working platforms should be provided where workers need to remain at structural nodes for extended periods.
Welding safety
Remove flammable materials, provide fire extinguishers and spark protection, and ensure welding equipment has proper insulation and grounding.

Temporary fixing
After each truss unit is positioned, complete the required bolted connections, tack welding, or temporary bracing before releasing the lifting hook. The truss must be adequately stabilized before proceeding to the next stage.
Real-time monitoring
Monitor deformation at key structural points and check site weather conditions during critical lifting operations. Hoisting and high-altitude work should stop when conditions exceed the limits specified in the approved construction scheme.
Making Safety Systems Work on Large-Span Steel Pipe Truss Sites
Sound systems are the rigid guarantee for the efficient operation of the safety framework.
Safety responsibility system
Establish a full‑responsibility system from the project manager down to frontline workers, with signed responsibility statements at each level, forming a pattern of “everyone is responsible and jointly manages” for such projects.
Multi‑level safety inspections
Implement daily inspections, special inspections (equipment, supports, electrical), and regular inspections led by the project manager. All identified hazards must be closed out with corrective actions.
Safety meeting system
Insist on daily pre‑shift safety briefings and weekly safety summary meetings, dynamically emphasizing risk points based on the tasks at hand when installing large-span structures.
Incentive and disciplinary mechanisms and record management
Reward safe behaviors and correct violations. Maintain complete records of training, technical briefings, inspections, drills, etc., as a basis for continuous improvement.
How Yunjoin Supports Large-Span Steel Pipe Truss Projects
Yunjoin integrates design, fabrication, and installation for large-span steel pipe truss projects. Early engineering involvement allows the team to coordinate truss unit division, ground assembly, hoisting arrangements, temporary supports, connection methods, and installation requirements.
Yunjoin supports large-span steel structure projects including stadiums, railway stations, industrial facilities, and other large-span buildings. This integrated approach helps connect structural design with the practical requirements of fabrication, transportation, hoisting, assembly, and installation.


For project owners and general contractors, working with a supplier experienced in both fabrication and installation can help reduce coordination risks and improve construction efficiency.
Conclusion
Safe Large-Span Steel Pipe Truss Installation depends on careful planning, controlled hoisting, temporary stabilization, fall protection, welding safety, weather monitoring, and proper inspection.
If your next project involves long-span steel pipe trusses, talk to our engineering team about a safer, faster installation strategy.


